Shandong Xingrui Building Materials Co., Ltd. manufactures high-performance early release head for formwork systems engineered for high-turnover construction projects. Constructed from aluminum alloy and cast iron, our drop heads are designed for 48-series steel props with a 120mm bearing platform width and a conventional load capacity of 40kN. With ISO 9001 certification and production through 6 automatic welding lines across our 40,000㎡ standardized workshop, we deliver consistent quality backed by 180 professional technicians. Our product enables formwork stripping within 3-4 days while maintaining vertical support during concrete curing, reducing your formwork inventory investment by up to 70% and accelerating project cycles.
The product is a precision structural component that bridges vertical support props and horizontal primary beams in modular slab systems.
Its core function allows you to safely remove horizontal formwork panels and beams while vertical props continue supporting your curing concrete. This solves the industry challenge of material stagnation, where expensive formwork remains locked for 14-28 days awaiting full concrete hydration.
By integrating our drop head system, you recover up to 70% of horizontal equipment within 3-4 days once concrete reaches 70% design strength. This dramatically reduces your inventory requirements and shortens construction cycles, particularly valuable in repetitive floor plate designs.
| Parameter | Specification |
|---|---|
| Material | Aluminum alloy / Cast iron |
| Prop Compatibility | 48-series steel support |
| Platform Width | 120mm |
| Load Capacity | 40kN (conventional) |
| Drop Stroke | 60-100mm |
| Material Standard | Ductile iron GGG40/50 / Q235 galvanized steel |
| Surface Treatment | Hot-dip galvanization (≥65-85 microns) |
| Quality Certification | ISO 9001, ISO 14001, CE |
| Customization | Available per drawings/samples |
| Reusability | Multiple cycles |
Our early release head for formwork delivers measurable cost and time savings for your projects.
Accelerated Turnover Cycles
The system shortens formwork rotation from 14-28 days to 3-4 days. This enables 4-day pour cycles in high-rise commercial structures, maintaining tight project schedules without compromising safety.
Reduced Capital Expenditure
By recovering horizontal beams and panels early, you cut one-time formwork investment significantly. The same equipment set serves multiple floors simultaneously, optimizing your asset utilization.
Stable Load-Bearing Performance
Manufactured from high-grade materials with axial load capacity ranging 30kN-60kN per unit, our heads maintain structural integrity throughout the curing phase. Vertical props remain under compression, preventing slab deflection during critical hydration periods.
Easy Installation and Operation
The wedge-action or gravity-latch mechanism ensures secure locking during concrete pouring and controlled release during striking. Your crew can operate the system without specialized training, reducing labor complexity.
Durable and Reusable Design
Hot-dip galvanized surfaces exceeding 65-85 microns resist corrosion in alkaline concrete environments. Mechanical cycle life testing simulates years of site usage, ensuring long-term reliability across hundreds of pours.

The system with early release head for formwork excels in demanding B2B construction environments where rapid cycling directly impacts profitability.
High-Rise Commercial Buildings
In repetitive floor plate designs, our drop heads enable 4-day cycles essential for maintaining schedule milestones. Contractors working on 30+ story towers report inventory reductions of 50-70% compared to conventional methods.
Large-Scale Infrastructure Projects
For underground subway stations or heavy-duty podium slabs, the early release head allows removal of aluminum or timber beams while maintaining structural support in vibration-sensitive zones. This is critical where adjacent structures or ongoing operations require minimal disturbance.
Industrial Facilities
Expansive floor areas benefit from 'zone-stripping' capabilities. You can reuse formwork panels across different sections of the same floor, reducing total material expenditure and enabling phased construction in operational facilities.

Our manufacturing process ensures structural reliability and mechanical repeatability that meet international benchmarks.
Load Bearing Verification
We conduct destructive and non-destructive testing per EN 1065 standards to verify ultimate limit state performance. Each batch undergoes compression testing to confirm rated capacity compliance.
Welding and Dimensional Integrity
Ultrasonic inspection verifies weld penetration on fabricated steel heads. Dimensional tolerance checks ensure compatibility with props and beams, where even 1mm deviation could cause system instability.
Surface Treatment Quality
Hot-dip galvanization thickness measurements exceed 65-85 microns to prevent oxidation in alkaline environments. Our electrostatic spraying workshop and quality inspection protocols maintain consistency across all units.
Cycle Life Testing
We mechanically engage and release the drop mechanism thousands of times, simulating years of site usage. This ensures the wedge and pin components maintain smooth operation after extensive reuse.

Q:When can I safely strike the product?
A:Striking typically occurs once concrete reaches 70% of design strength, usually verified through cube or cylinder tests. This generally happens within 3-4 days under normal curing conditions.
Q:Is your early release head compatible with all prop brands?
A:Our heads are designed for standard 48mm prop inner tubes. While compatible with most brands, we recommend using Xingrui props to ensure locking pins align perfectly with perforation patterns.
Q:Does using the system increase risk of slab deflection?
A:No. Because vertical props remain under compression and are never removed during panel stripping, your slab stays fully supported throughout the critical curing phase.
Q:How do I maintain the release mechanism?
A:Clean cement slurry from wedge and pin components after each use. Apply non-staining lubricant every three cycles to ensure smooth drop functionality and extend service life.
Q:Can it be used for sloped slabs?
A:Yes, with specialized swivel-head adapters or wedge-compensation plates. These ensure axial load remains vertical relative to the prop, maintaining structural integrity on inclined surfaces.